Ashrae compliance documentation was recently completed for Langley Secondary School Block 15. Installed lighting power Analysis was met with flying colors. Congratulations. Increasing number of designers and builders are being surprised at the closing stages of construction that Ashrae requirements are being enforced by authority having jurisdiction (AHJ).